An Antarctic Expedition Monitoring Essential Climate Variables with GNSS
Case Study

An Antarctic Expedition: Monitoring Essential Climate Variables with GNSS

Discover new remote sensing techniques using Leica GNSS equipment.

Electric towers
Case Study

Automated Monitoring for Tower Inspections

ENA Tower Testing Station in Turkey, replaced manual methods with an automated monitoring solution, which significantly streamlined the monitoring process.

Edgar Cardoso Bridge monitoring case study thumbnail image
Case Study

Bridge rehabilitation: Real-time monitoring of a 40-year-old bridge

The Leica Geosystems’ monitoring package for the rehabilitation of the Edgar Cardoso bridge in Figueira da Foz, Portugal.

Monitoring of the 1915Çanakkale Bridge in Turkey - Leica Monitoring Solutions
Case Study

Bridging the continental divide

The permanent monitoring system for the 1915 Çanakkale Bridge, connecting Turkey and the rest of the European continent.

Case Study

Building a Precise Monitoring Network

Weather conditions, aging, human activity, geological changes and other factors can alter structures and pose a challenge for engineers that strive to maintain the health of the constructions that our economies and daily lives depend on.

man performing monitoring measurements with Leica Geosystems total station
Case Study

Campaign monitoring in heavy construction

The importance of monitoring is growing in heavy construction as the rapid execution of projects requires enhanced focus on worker safety and structural health.

Case Study

Combining geotechnical and geodetic data for monitoring

 Building new infrastructure in cities with rich cultural heritage.

aerial map depicting monitoring technologies at a tailings dam in Brazil
Case Study

Combining technologies for real-time dam monitoring

Read more how companies have increased their investment in monitoring after disastrous dam breaches in Brazil in 2015 and 2019.

Case Study

Connecting through Monitoring

When the South Road Superway in South Australia was completed, there was an important monitoring project. 

Designing a Dam Monitoring System

In early 2017, winter storms filled and then overfilled reservoirs in California, USA, leading to the evacuation of hundreds of thousands of citizens near Lake Oroville, California's second largest manmade lake. 

Terradata & Leica Geosystems Case Study - Digging deeper with monitoring - Thumbnail
Case Study

Digging deeper with monitoring

Get into the details and the necessity of a well-planned monitoring project to support a long-term expansion project of the railway station in Winterthur, Switzerland.

Easing the ravages of time
Case Study

Easing the ravages of time

Preserving cultural artefacts with a total station in Sweden.

Ensuring a smooth flow through a canal
Case Study

Ensuring a smooth flow through a canal

Monitoring water levels in Germany with GeoMoS.

Case Study

Ensuring Smooth Flow

Germany's busy Kiel Canal has got modernised and carried out safety improvements with a monitoring system.

Case Study

GNSS Monitoring for Safety on the Brenner

Leica Geosystems instruments ensured the centimeter accuracy of the Gotthard miner's work and the engineers in charge at the Brenner Base Tunnel.

Harnessing the Power of GNSS for Monitoring Hydro Energy Infrastructure - GNSS Monitoring in Italy and Spain
Case Study

Harnessing the Power of GNSS for Monitoring Hydro Energy Infrastructure

Enel Green Power, a global leader in the renewable energy sector, initiated a year-long project to evaluate the benefits of using Leica Geosystems’ automated GNSS monitoring system to acquire real-time data 24/7.

Case Study

Innovative System Ensures Vertical Aligment of Gerald Desmond Bridge

For the Gerald Desmond Bridge Replacement project, a vertical alignment system has been developed by Leica Geosystems.

Case Study

Innovative Vertical Alignment Systems Keeps 432 Park Ave Plumb

Leica Geosystens has developed the current state of art in high-rise construction control and the Vertical Alignment System for tall buildings. 

Case Study

Keeping a vigilant eye

In the Newmont's Ahafo South Mine there is countinuous, extensive monitoring to keep open pit miners safe from falling rocks or collapsing walls.

Case Study

Keeping Boston's Millenium Tower on Target

New solutions monitoring the Millenium Tower Bosten with the GNSS-based vertical alignment system. 

Monitoring Kristianstad’s central sewage treatment plant with Eva Nilsson of Matrix AB
Case Study

Kristianstad’s central sewage treatment plant

Automated monitoring ensures full control of sensitive ground when central sewage treatment plant undergoes expansion.

Campaign monitoring at tailings dams across Brazil - Leica Geosystems
Case Study

Latest total station technology speeds campaign monitoring

Cepemar plays a key role in monitoring tailings dams at mines across Brazil to help companies enhance safety and comply with national laws.

Central Park Tower
Case Study

Locating the floors of America's tallest residential building

Deploying a GPS solution to locate the layout of Central Park Tower‘s floors.

Käppeli Digital and Monitoring in Heavy Construction - Thumbnail
Case Study

Monitoring & the future of heavy construction

Käppeli Digital from Sargans has expanded its service offering. By adding monitoring, they can undertake monitoring projects internally.

Monitoring the historic Dom Carre Hotel  during renovation
Case Study

Monitoring a heritage hotel in the historic centre of Cologne

Preserved as a historic building had to be preserved while partial demolition of its internal structure was carried out.

Monitoring a landslide in Zaldibar Spain
Case Study

Monitoring a landslide recovery operation

Emergency services needed to quickly control the stability of the slopes in order to begin rescue operations. Working in a unstable situation, they needed an alert system.

Case Study

Monitoring above and below ground in London's heart

With the exponential growth in transportation infrastructure monitoring of any maintenance or construction works has never been more important. 

Case Study

Monitoring Along the Construction Site of the Warsaw Metro Line 2

The Warsaw Metro is a rapid transit system serving the city of Warsaw

View of Train at Sydney's Central Station being monitored by a Leica TM50 Total Station
Case Study

Monitoring Australia's biggest transport project

Leica instruments and software highlight the complex system monitoring the tracks during Central Station’s Sydney Metro upgrade.

 

A non-intrusive monitoring solution from Leica Geosystems
Case Study

Monitoring busy UK highway during rail construction

A high-speed train, a critical highway and a monitoring challenge.

Case Study

Monitoring Dublin commuters' safety

Keeping light railway travellers safe with a monitoring system in Dublin, Ireland.

Leica Geosystems Monitoring Solutions for Slope Monitoring in Open Pit Coal Mines
Case Study

Monitoring for Safety and Efficiency in Open Pit Coal Mining

Leica Geosystems' automated monitoring solution aids safety in Indonesia's open-pit coal mining industry. 

Leica Geosystems - Monitoring Solutions - Harvard Stadium
Case Study

Monitoring historic Harvard Stadium

Find out how monitoring helps guide Harvard to make appropriate decisions on the life-safety of the famous Harvard stadium.

Case Study

Monitoring Melbourne's railways

City infrastructures are not built overnight. In between planning, design and construction, there are other crucial activities – just like monitoring happening at the same time.

Case Study

Monitoring Mother Natures Forces

The Messina region is hit with natural disasters but with the advanced surface monitoring system they avoid the element of surprise.

Leica ComBox60 Rail Monitoring Project with Survey Solutions
Case Study

Monitoring of rail infrastructure: Survey Solutions

Even the smallest movements can cause long term complications, thus, it is critical that these structures are monitored.

Monitoring One of the World‘s Busiest Airports - Leica Geosystems
Case Study

Monitoring One of the World‘s Busiest Airports

A solution for structural and geodetic airport monitoring during construction process.

Case Study

Monitoring Pays Off

With the Leica Deformation Monitoring solution GeoMos local authorities were able to evacuate the valley's industrial zone and several roads at an early stage in Ticino. 

Royal Canadian Hangars Monitoring 1680 x 856 px
Case Study

Monitoring the structural health of 80-year-old hangars

Monitoring the Royal Canadian Air Force Warren Truss Hangars’ wooden structure.

Case Study

Moving a camel through the eye of a needle to GNSS

Undocking cruise ships’ power stations with the help of GNSS in Germany.

Case Study

Moving a Capital City Forward

In a country where 20 deaths a day are contributed to vehicular accidents, a public transportation system could translate into saved lives. 

Moving London safely forward
Case Study

Moving London safely forward

A new underground station directly beneath the historic landmark was built. The new station will be known as the Crossrail Paddington Station.

Case Study

Owen Street Level Crossing, Tipton

In a world where there is no such thing as absolute stability, movement is an ever present phenomenon, how much something moves and when, has different importance to different people. 

Case Study

Prescise positioning in London's sky

Obtaining precise and reliable coordinates during the construction process of London’s second tallest skyscraper with a tailor-made GNSS solution.

Protecting key infrastructure during tunnelling

Protecting Key Infrastructure During Tunnelling

In today’s modern and growing world of business logistics, construction companies are on a journey. A journey to create a new, better, brighter, and inspiring environment for industrial & logistics business.

Case Study

Railway and platform monitoring during construction

The automated monitoring solution developed combining Leica Nova TM50 total stations and WiSen wireless sensors.

Real-Time monitoring - Landslide risk management
Case Study

Real-time monitoring advances landslide risk management

In 2018 the 200 residents of British Columbia’s Old Fort were shocked by the roar of a landslide.

Rock solid
Case Study

Rock solid

Fortunately no one was injured when 100'000 cubic meters of rock slid down a rocky scarp near a hydroelectric facility northeast of Cambell River, British Colombia, Canada.

Case Study

Safely renovating ship locks

Monitoring the Kiel Canal 

Case Study

Safety on the High Seas

The "Lukoil" Ltd. has initiated a geodynamic monitoring system on a maritime, ice-resistant platform to ensure safety on the high seas. 

Case Study

Scanning high-traffic roads unmanned

Monitoring the roadways of Singapore

Case Study

Searching for hidden chambers adjacent to Tutankhamun's tomb

In the quest for finding hidden chambers in Tutankhamun’s tombs with Ground Penetrating Radar in Egypt.

Leica Geosystems Semi-Automated Solution for Hospital Helipad Monitoring
Case Study

Semi Automated Solution for Hospital Helipad Monitoring

A semi-automated monitoring project to assess the helipad structure’s safety at emergency and of the largest accident hospital in the UK.

Slope movement monitoring at Hinkley Point C nuclear power station
Case Study

Slope movement monitoring at Hinkley Point C

The new Hinkley Point C nuclear power station that will produce enough carbon electricity to power 6 million UK homes.

Case Study

The Great Ancona Landslide

The City of Ancona has designed and installed a complex integrated monitoring system to provide constant control of the landslip area. 

The Sailors Journey
Case Study

The sailors journey

GNSS receivers guide an around-the-world adventure of the Italian sailor.

Case Study

The Shard: London's New Skyline

In the summer of 2009, Leica Geosystems has developed a real time slip-form rig positioning system, used to construct the central concrete core of The Shard.

WiSen Smart Monitoring Solution - Leica Geosystems
Case Study

The Smart Monitoring Solution for the Rennes Metro

Continuous monitoring during an extensive rail line expansion in Rennes, France.

Kings Cross prism and tilt
Case Study

Underneath King s Cross redevelopment

King’s Cross, one of the most significant reconstruction projects in London, UK, monitored by a tailored monitoring solution.

Case Study

Winning total construction services

How Leica Geosystems instruments provided cost-saving benefits for monitoring and construction applications.

Teodoliten, Sweden - Working smarter and more efficiently with automated monitoring solutions - Leica Geosystems
Case Study

Working smarter and more efficiently with automated monitoring

Teodoliten grew with monitoring and expanded their service portfolio adding automated monitoring solutions.