Transportation

70 Miles of highway mapping to full engineering design in 99 days

Completing a demanding 70-mile highway mapping project in only 99 days in the United States

Laser Scanning on the go

3D scan of rail tracks with the Pegasus:Backpack.

Maximum safety for the new Copenhagen Metro Line

Monitoring underground construction with a total station.

Moving London safely forward

Preventing unsafe building conditions with a total station.

Light at the end of the tunnel

Total stations and gyroscopes for precise tunnel measurement.

Kapcsolat Leica Geosystems

Válassza ki a keresett Leica Geosystems szolgáltatást, amihez elérhetőséget szeretne: értékesítés, terméktámogatás vagy szerviz.