Layout Points and M&E Fit Out with Kane Group
Since being founded in 1967, Kane, a leading MEP contractor in the UK, has grown into a multi-disciplined Building Services Contractor. As part of the West India Docks project, a twenty-six-story hotel building, they utilised the Leica iCON solutions for building construction layout applications, to replace traditional methods of layout using chalk and string. Watch how iCON increased productivity by minimising labour time and mistakes, and on the other hand, increased accuracy and speed.



.jpg?sc_lang=ru-ru&hash=4CD86478982FB67ABA5615CA3D9427CD)

