Edgar Cardoso Bridge monitoring case study thumbnail image
Case Study

Bridge rehabilitation: Real-time monitoring of a 40-year-old bridge

The Leica Geosystems’ monitoring package for the rehabilitation of the Edgar Cardoso bridge in Figueira da Foz, Portugal.

Monitoring of the 1915Çanakkale Bridge in Turkey - Leica Monitoring Solutions
Case Study

Bridging the continental divide

The permanent monitoring system for the 1915 Çanakkale Bridge, connecting Turkey and the rest of the European continent.

man performing monitoring measurements with Leica Geosystems total station
Case Study

Campaign monitoring in heavy construction

The importance of monitoring is growing in heavy construction as the rapid execution of projects requires enhanced focus on worker safety and structural health.

Case Study

Combining geotechnical and geodetic data for monitoring

 Building new infrastructure in cities with rich cultural heritage.

aerial map depicting monitoring technologies at a tailings dam in Brazil
Case Study

Combining technologies for real-time dam monitoring

Read more how companies have increased their investment in monitoring after disastrous dam breaches in Brazil in 2015 and 2019.

Terradata & Leica Geosystems Case Study - Digging deeper with monitoring - Thumbnail
Case Study

Digging deeper with monitoring

Get into the details and the necessity of a well-planned monitoring project to support a long-term expansion project of the railway station in Winterthur, Switzerland.

Easing the ravages of time
Case Study

Easing the ravages of time

Preserving cultural artefacts with a total station in Sweden.

Ensuring a smooth flow through a canal
Case Study

Ensuring a smooth flow through a canal

Monitoring water levels in Germany with GeoMoS.

Monitoring Kristianstad’s central sewage treatment plant with Eva Nilsson of Matrix AB
Case Study

Kristianstad’s central sewage treatment plant

Automated monitoring ensures full control of sensitive ground when central sewage treatment plant undergoes expansion.

Central Park Tower
Case Study

Locating the floors of America's tallest residential building

Deploying a GPS solution to locate the layout of Central Park Tower‘s floors.

Käppeli Digital and Monitoring in Heavy Construction - Thumbnail
Case Study

Monitoring & the future of heavy construction

Käppeli Digital from Sargans has expanded its service offering. By adding monitoring, they can undertake monitoring projects internally.

Monitoring the historic Dom Carre Hotel  during renovation
Case Study

Monitoring a heritage hotel in the historic centre of Cologne

Preserved as a historic building had to be preserved while partial demolition of its internal structure was carried out.

Monitoring a landslide in Zaldibar Spain
Case Study

Monitoring a landslide recovery operation

Emergency services needed to quickly control the stability of the slopes in order to begin rescue operations. Working in a unstable situation, they needed an alert system.

View of Train at Sydney's Central Station being monitored by a Leica TM50 Total Station
Case Study

Monitoring Australia's biggest transport project

Leica instruments and software highlight the complex system monitoring the tracks during Central Station’s Sydney Metro upgrade.

 

Case Study

Monitoring Dublin commuters' safety

Keeping light railway travellers safe with a monitoring system in Dublin, Ireland.

Leica Geosystems - Monitoring Solutions - Harvard Stadium
Case Study

Monitoring historic Harvard Stadium

Find out how monitoring helps guide Harvard to make appropriate decisions on the life-safety of the famous Harvard stadium.

Case Study

Monitoring Melbourne's railways

City infrastructures are not built overnight. In between planning, design and construction, there are other crucial activities – just like monitoring happening at the same time.

Leica ComBox60 Rail Monitoring Project with Survey Solutions
Case Study

Monitoring of rail infrastructure: Survey Solutions

Even the smallest movements can cause long term complications, thus, it is critical that these structures are monitored.

Royal Canadian Hangars Monitoring 1680 x 856 px
Case Study

Monitoring the structural health of 80-year-old hangars

Monitoring the Royal Canadian Air Force Warren Truss Hangars’ wooden structure.

Case Study

Moving a camel through the eye of a needle to GNSS

Undocking cruise ships’ power stations with the help of GNSS in Germany.

Case Study

Prescise positioning in London's sky

Obtaining precise and reliable coordinates during the construction process of London’s second tallest skyscraper with a tailor-made GNSS solution.

Case Study

Railway and platform monitoring during construction

The automated monitoring solution developed combining Leica Nova TM50 total stations and WiSen wireless sensors.

Real-Time monitoring - Landslide risk management
Case Study

Real-time monitoring advances landslide risk management

In 2018 the 200 residents of British Columbia’s Old Fort were shocked by the roar of a landslide.

Case Study

Searching for hidden chambers adjacent to Tutankhamun's tomb

In the quest for finding hidden chambers in Tutankhamun’s tombs with Ground Penetrating Radar in Egypt.

Slope movement monitoring at Hinkley Point C nuclear power station
Case Study

Slope movement monitoring at Hinkley Point C

The new Hinkley Point C nuclear power station that will produce enough carbon electricity to power 6 million UK homes.

The Sailors Journey
Case Study

The sailors journey

GNSS receivers guide an around-the-world adventure of the Italian sailor.

Kings Cross prism and tilt
Case Study

Underneath King s Cross redevelopment

King’s Cross, one of the most significant reconstruction projects in London, UK, monitored by a tailored monitoring solution.

Case Study

Winning total construction services

How Leica Geosystems instruments provided cost-saving benefits for monitoring and construction applications.